Project |
Consultant/Owner |
|

|
The
Rainbow River Watershed Management Plan.
This 78-square mile watershed includes a first-magnitude spring that
serves as the headwaters to the Rainbow River. Jones Edmunds &
Associates, Inc. conducted this investigation on behalf of the Southwest
Florida Water Management District and Marion County. |

|
 |
The
City of Edgewater Stormwater Master Plan.
In an effort to better address flood protection for its citizens, the
City of Edgewater contracted PEC to prepare a comprehensive stormwater
master plan including extensive H&H modeling of 9,000 acres with
ICPR.
|

|
 |
The
Simpson Creek Watershed Study.
Base Flood Elevations were established along a portion of Simpson Creek
in South Carolina by the Earthworks Group using ICPR. Their work
was submitted to and approved by FEMA as a map modification to the
existing Flood Insurance Rate Maps. |

|
|

|
Drainage
Analysis, Tracts A & B, Lubbock Medical Center.
AMD Engineering prepared a detailed drainage analysis of an
interconnected system of Playa Lakes in support of site design work for
the Lubbock Medical Center. This system included several split
flow conditions that were easily modeled with ICPR. |

|
|

|
Chesterfield
Valley Final Conditions Stormwater Analysis.
Master flood management plan of a 4,500-acre watershed located along the
south bank of the Missouri River. The adopted plan and ICPR model
are used as tools in the city's stormwater ordinance and to assist in
qualifying for the National Flood Insurance Program. |

|
 |
Crane
Strand Regional Stormwater Facility.
The purpose of this project was to identify potential regional
stormwater facility locations along the Crane Strand Canal and to
evaluate a series of design alternatives to mitigate flooding problems
and reduce pollutant loads to the canal. ICPR was used for all
H&H modeling associated with this project.
|

|
|
|
more
projects ...
|
|