The Simpson Creek Watershed Study


The EARTHWORKS Group conducted a watershed study of the Simpson Creek drainage basin located in Horry County, South Carolina to determine the 100 year flood elevations upstream of the S.C. Highway 905 Bridge. The watershed upstream of the S.C. Highway 905 Bridge was an unnumbered “A” flood zone, with the base flood elevation undetermined. Downstream of the S.C. Highway 905 bridge, the Waccamaw River basin has flood elevations established up to Star Bluff Road. The FIRM panels show the published flood zone is an AE18 in this section of the Waccamaw River. The purpose of this study was to establish an elevation for the development of the Polo Farms Phase 2 residential subdivision.

ICPR was used for both hydrologic and hydraulic modeling of this 41-square mile watershed in an effort to establish Base Flood Elevations in the unnumbered "A" zone of the study area. Baseline information was collected during 2005 and assembled using a Geographic Information System (GIS) to include aerial photography, USGS quadrangle maps, National Wetland Inventory maps, SCS soils maps, Horry County digital terrain model (DTM) data, and discrete survey information collected from the major nodes and cross sections within the watershed. The watershed was divided into 20 sub-basins using the DTM data, and curve numbers were assigned based on the existing soils and land use shown on the 2004 aerial photography. 

The study was submitted to and approved by FEMA as a map modification to the existing Flood Insurance Rate Maps (FIRM) data and allowed a national housing developer to continue the second phase of a residential project.

Project Location

The study area is located in Horry County, South Carolina approximately 15 miles northeast of Conway.  

Location Map

 

Contact Information

For more information on this project, please contact Mark Donevant with Earthworks.  

 

Report Information

For more information on this project, you can download the final report from Earthworks' website.